October 2019 16 months for new bridge | June 2018

Opis:
This is a little documentary for the history books of the works for the construction of the new bridge connecting the hamlet of San Leonardo to the main road.


▶ https://www.ustariaposta.it
▶ https://eat.ustariaposta.it